Kitchen at the New House

One side of the kitchen. The door closed by drywall will be going to the pantry.


The other end. One door going to laundry room and the other to a half bath.


The hole on top was used for stove ventilation. I don't think we will use it, because the vent that will fit there is commercial grade, huge, and expensive. The door goes to the back deck. I can't believe they painted the door the same color as the wall. Sometimes when I turn around fast, I can't tell where the door is. Anyway, we will replace it with better looking one with glass to utilize the natural light coming from outside.


This is a bathroom, yes, it's in the kitchen. We will move it to the second picture and make it a half bath only because the house already have four other full bathrooms.


2nd ODS sizing it up. This door goes to the living room. We will remove the top half of the wall infront of him and we will make the doorway into passageway and wider to make living room & kitchen blend.
The kitchen cabinets, sink, and sink faucet is being order this week. They said it will take about ten days to arrived. So hopefully drywall will be up, tile floor replaced, and electricity in place before they get deliver. Crossing my fingers.